> ”The answer, in short, is “P.S.R.” — or precision-scheduled railroading. P.S.R. is an operational strategy that aims to minimize the ratio between railroads’ operating costs and their revenues through various cost-cutting and (ostensibly) efficiency-increasing measures. The basic idea is to transport more freight using fewer workers and railcars.” That’s a long-winded way of saying: ‘We’d rather make more money tha…
This makes precision scheduling impossible... what this really is, is let's make all the workers wait (for free!) while we figure out how we can finally get the freight in monstrously long trains moving through a system that wasn't designed for it.
The SECOND problem is that slashing the labor pool, and thus reducing the labor cost at the expense of reliability and system performance, appears to be the actual goal of PSR.
I stand with the workers, no essential worker should be forced to work "on-call". Especially not people so important to safety and National Security.