From an attack PoV that's hundreds of square miles to destroy or disable many structures Vs taking out a single target. ie. They can nibble a bit at an array before you're onto them Vs everything gets thrown at a point source target.
What about some kind of mass underwater drone attack? Feels like it might be feasible in the not too distant future...
Court orders restart of all US offshore wind power construction
41–50 of 446 posts
Re: Court orders restart of all US offshore wind power construction
#42Earlier quoted context omitted.
Well, judicial checks and balances should protect them until regime change, which is coming.
I dunno. The Americans stuck their hand in a blender for four years and then four years later needed to try it again. Alas, Stumpy McNubs remains long on limbs but short on memory.
https://old.reddit.com/r/politics/comments/1puwkpj/democrats...
https://old.reddit.com/r/politics/comments/1qu6vyu/trump_cal...
https://thehill.com/homenews/campaign/5716988-democrats-scor...
https://www.npr.org/2026/02/01/nx-s1-5695678/democrat-taylor...
Re: Court orders restart of all US offshore wind power construction
#43Re: Court orders restart of all US offshore wind power construction
#44If these projects ultimately end up canceled they’ll be the largest “mostly done” infrastructure projects to be cancelled. A huge waste. And a monument to US incompetency.
Well, judicial checks and balances should protect them until regime change, which is coming.
Re: Court orders restart of all US offshore wind power construction
#45If these projects ultimately end up canceled they’ll be the largest “mostly done” infrastructure projects to be cancelled. A huge waste. And a monument to US incompetency.
Worse than the Superconducting Supercollider?
Wind farms produce electricity which pays for the investment when you finish but pays nothing when a stop early. This makes stopping early extremely economically harmful.
Re: Court orders restart of all US offshore wind power construction
#46posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…
Re: Court orders restart of all US offshore wind power construction
#47posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…
[1] https://www.nbcnews.com/business/energy/trump-offshore-wind-...
Re: Court orders restart of all US offshore wind power construction
#48Earlier quoted context omitted.
What about some kind of mass underwater drone attack? Feels like it might be feasible in the not too distant future...
Is that especially simpler than e.g. an attack on the above ground cabling systems by firing carbon fibre conducting wires over them, as the US is said to have done in the Iraq war? Not that I don't think underwater drones are a future risk, but the belief its a risk which can't be mitigated, or a worse risk than ones which exist onshore, seems a bit weak. But none the less, yes. This would be a risk. Perhaps one whi…
Re: Court orders restart of all US offshore wind power construction
#49If these projects ultimately end up canceled they’ll be the largest “mostly done” infrastructure projects to be cancelled. A huge waste. And a monument to US incompetency.
Well, judicial checks and balances should protect them until regime change, which is coming.
Re: Court orders restart of all US offshore wind power construction
#50posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…
The pretext for the suspension was radar noise.[1] [1] https://www.nbcnews.com/business/energy/trump-offshore-wind-...