> Which is of course why all recent western proejcts have equal outcomes to FV3.
Yes, because we stopped building. Once we start building again, those problems go away by themselves.
And no, the handout of tax money you complain about is to intermittent renewables, not to nuclear. Exactly the reverse of your claims. Just look at the EDF financial reports. Nuclear produces profits that are returned to their owner, despite having to finance ARENH.
Oh, of course EDF does receive state subsidies. For their intermittent renewables projects. Ba-da-dumm-tss.
Same in Germany: renewables are subsidized in production with around €20 billion per year just for the EEG, never mind the feed-in priority they get that lets them shunt the massive problems of their intermittency onto the other suppliers. That's probably worth more. Oh, and the preferential loan conditions and reduced regulatory burden etc.
Nuclear power in Germany never got a single cent for production. And had to account for all the sorts of costs others get to externalize, such as waste.
So once again: exactly the opposite of your claims.
The problem is not building new. The problem is building the first new.
For evidence of this, just look to China: they also built FOAK AP-1000 (Vogtle) and EPR (FV3, HPC).
And lo-and-behold: their FOAK versions of these also took around 10 years to build, whereas China typically builds in 5, so twice as long. In absolute terms they were a little faster, because they actually have industrial experience with nuclear (currently building 20+ reactors, lots more planned), the thing that needs to be rebuilt in Europe and the US.
Nowadays, they are building their NOAK AP-1000s in 5 years, for $3.5 bn. They didn't go for more EPR, as the AP-1000 is a better design. The EPR also hasn't won any of the recent tenders for nuclear reactors, for example in Poland (AP-1000) and the Czech Republic (South Korean APR-1400)
So to repeat: the problems with FOAK builds are well-known, as are the ones with building up nuclear expertise in a country. These go away by themselves once you build a number plants, preferable of the same design. The problems with the EPR design go away once you stop building EPRs.
Now these are actual facts.
Whereas all you've come up with is empty slogans and emotional fantasies.