Re: We're moving to a four-day work week at Beacon

#321

I work a four-day week (80% time, not imagining 4-10s) as a software engineer at a non-profit academic organization. For a paycut basically, I make 80% of what I think of as my "actual" salary. I have managed to do this at a succession of several jobs now. When I briefly tried to go back to 5 days, it was really hard. It seems insane to me now that anyone works 5 days a week. (And I do know plenty of people work even…

What is 4-10s?

Four 10-hour workdays, as opposed to five 8 hour days.

Re: We're moving to a four-day work week at Beacon

#322

Earlier quoted context omitted.

When I was working before my retirement I routinely had to work 60 hr weeks since I was lead (went to every meeting) and wrote code full time along with my team. Most of our projects started with a hard deadline (estimates were only used for budgeting, the time was predetermined) and constant change was endemic during every project. No way this would fit in 32 hr weeks. Yet we still had sprints (which assumed 40 hrs…

Absolutely. Almost every org treats engineers as an expendable resource. They do this because they fear the alternative, which requires treating people with respect, because those people are valuable to your organization.

>They do this because they fear the alternative

they do it because they can. Engineers have the tendency to be overly individualistic and ignore collective bargaining which is the primary means by which people can gain better working conditions. As long as people are willing to put in those 60 hours to climb up the next career rank ahead of their peers it's gonna be that way.

Re: We're moving to a four-day work week at Beacon

#323
post #295

Earlier quoted context omitted.

If you can do your work week in 4 days without losing productivity, you don't have anywhere near enough responsibilities.

That makes no sense. I have exactly the same responsibilities as before my switch. I also have exactly the same responsibilities as my peers working 5 days. And yet I successfully squeeze those 5 days into 4, and it wasn't even that hard. Magic? No, modern office work is incredibly ineffective. Most of the day is spent collaborating with almost no part of the day spent on actually doing things.

That's what I'm saying. If you put 5 days of work into 4, you didn't have enough work before the switch.

Re: We're moving to a four-day work week at Beacon

#324

Earlier quoted context omitted.

If you only said you don't want other's needs to affect you, that would be a valid opinion. (Albeit not very altruistic) But what you're saying is also that those wanting to be at the office are friendless, need this as a substitute for a normal life etc. That's unnecessary, and just you being a total dick. Please present your arguments here in a better way.

i never said that. please be more mindful when making accusations and try and reread what people write here if english is not your strength, instead of being a pretentious prick.

Ah yes you only said:

>My personal observation is that most pro office folks are seeking to substitute gaps in their personal lives with onsite work. A drain on their coworkers to be frank. Lack of friends, proper housing, lack of exercise you name it. A tiring hindrance on those...

This is an unfair and spiteful characterisation of people who happen to have a different viewpoint than you. We can do better than that.

Re: We're moving to a four-day work week at Beacon

#325

Earlier quoted context omitted.

You assume everyone is self-oriented and wants to be autonomous and have a great work ethics and care about their privacy. There are people like that. There are also people that want a lot of guidance. There are also people that just wants to be paid and don't really care much about the current job goals. There are also people that will do the bare-minumum they can to keep the job. Understanding who is who requires g…

> You assume everyone is self-oriented and wants to be autonomous and have a great work ethics and care about their privacy. No, they assume that people who are self-oriented and want to be autonomous and have a great work ethic are the people that you want to have working for you. You don't need to employ "everyone", you just need enough for your workload, and you will need fewer people if you optimize your company'…

The number of people on the planet is limited. Maybe you work in a venture backed startup and you hire people with a yearly salary of 100k or more. The rest of the startups from other locations and less funding will choose less talented people with a lower budget salary. The people you are hiring with great salaries have been educated with great effort and cost and rules previously by someone else.

Re: We're moving to a four-day work week at Beacon

#326
post #291
post #276

Earlier quoted context omitted.

I'd argue that the majority of office settings don't have moments of slack, but rather moments of productivity. This same productivity can be achieved in wayy less time than the standard 40 hours/week.

I can only agree, depending on what you include in "productivity". I'd say it's incredibly common for a modern office worker to be engaged in email, meetings and chat for some 4-6 hours per day. Not only does this leave little time to do actual tasks, that little time is also highly fragmented across the day. It's a point I've made repeatedly on similar threads: the problem with modern office work is too much collabo…

Give me a project to work on by myself and it will be done in 2 days. Give me the same project with a team of people to help and it will take months, it might never get done.

Just recently I had to migrate a website to some new servers with a new OS. Server build, fully automating the post-build and deployment, code changes, and testing… done in 2 days. Working with other teams around networking, change management, etc…. 9 months of waiting and hell.

Re: We're moving to a four-day work week at Beacon

#327
post #268

Earlier quoted context omitted.

You assume everyone is self-oriented and wants to be autonomous and have a great work ethics and care about their privacy. There are people like that. There are also people that want a lot of guidance. There are also people that just wants to be paid and don't really care much about the current job goals. There are also people that will do the bare-minumum they can to keep the job. Understanding who is who requires g…

Another sign of a low-trust organization: lots of managers to "keep an eye on" employees.

Please ask me questions rather than assuming I simply do things. In Waiterio we do not have managers at all so far. We are 6 people and there isn't a single manager. There you go!

Re: We're moving to a four-day work week at Beacon

#328

Earlier quoted context omitted.

No-one ever quit from our company so that's not it.

How many got wind of your surveillance policies and never bothered to apply? How many sensed your attitude towards your employees in the interview and took a different offer? How many spoke to one of your employees after the interview and then ghosted you? You can't measure the potentially wide-ranging negative impacts of your attitude and policies.

We are a startup of 6 people and we do international hires from different countries. So practically certainly no 2 candidates we've ever interviewed knew each other. You assume we are a big startup with a big budget and all problems that come with it. Ask questions next time.

Re: We're moving to a four-day work week at Beacon

#329
post #129
post #120

Earlier quoted context omitted.

What is a results oriented work week? How do you measure? If its "I said I would get X done" then yes, a four day work week is much better.

Sounds to me like someone does not trust employees to manage themselves and meet deadlines, and thats ok. I was coming into this thread from a highly skilled, well paid workers perspective. Completely agree, if you need to micro-manage then workday oriented results are easier.

Who is setting the deadlines? The ones that have been flying around my office lately completely ignore the engineers and architects. They are completely unrealistic and would have people working around the clock in a panic 7 days per week to try and meet them, and still slip. No thanks.

They don’t need to micromanage, but they are choosing to, and doing it very poorly (as if there is a good way).

Re: We're moving to a four-day work week at Beacon

#330

At https://www.waiterio.com we are fully remote and we introduced 32 hours work weeks except for customer support which still does 40 hours a week. We track hours with hubstaff.com which takes a random screenshot every 10 minutes. It's been a mixed bag. Half of the team kept productivity up and logged those 32 hours stably. Another half of the team, when left unchecked went down to 14 hours a week and very low output…

Measuring exact hours and performing surveillance is unbelievably immature.

This is not an argument. You are literally saying you don't want to believe in something that is actually happening. I'm telling you of a real problem with real people. You are saying it's not possible to believe it (unbelievably). You called me immature. Yet the problem stands and you have no idea of my actual maturity. You only apply correlation with the fact that other people you know that would do that surveillance would be immature. You don't know about my situation. Ask questions.