Earlier quoted context omitted.
1. Why do you think this was an engineering failure and not a business/implementation failure? For instance, in that famous pedestrian bridge collapse (a pedestrian walkway in a hotel in I think Kansas City collapsed shortly after opening, killing and injuring an absurd number of people), the bridge was designed correctly, but a deviation from the design in construction led to a fatal flaw. 2. What do you consider "p…
You're thinking of the Hyatt Regency (now Sheraton): https://en.wikipedia.org/wiki/Hyatt_Regency_walkway_collapse It was not as you describe; the original design was absolutely not correct. The original design was additionally so difficult to implement in reality that one of the manufacturers of the structural parts proposed a design change - one that made the flaws of the original twice as bad - that architects appr…
I'm probably willing to let my claim stand without anecdote (deviations from design occur outside the engineer's control), but honestly it's the weaker point, so let it drop. The more important one is that engineers design within a set of constraints, and if these parameters are exceeded, it is not the fault of the engineer.