A very thorough preliminary report. I've worked for a long time in quality systems, and this is a perfect example of a systemic failure. They've got work being handed off between Boeing employees and 3rd party contractors with insufficient controls in place to verify that very basic tasks are being performed. I'd be curious to know how many non-conformances they typically see during assembly of a plane and whether ma…
> As a result, this check job that should find minimal defects has in the past 365 calendar days recorded 392 nonconforming findings on 737 mid fuselage door installations (so both actual doors for the high density configs, and plugs like the one that blew out). That is a hideously high and very alarming number, and if our quality system on 737 was healthy, it would have stopped the line and driven the issue back to supplier after the first few instances.
Source:
https://leehamnews.com/2024/01/15/unplanned-removal-installa...