Earlier quoted context omitted.
Remarkably, all of those assertions are wrong.
Try and back up what your saying. What do you think happens if you build a 100GW solar panel farm without talking with the local electric utility?
In fact, as this particular transmission line will be feeding into the UK national grid, its normal role will be backup for offshore wind.
That somebody else at the end of a different transmission line might want access to the battery would be a good reason to site it where those lines meet. Another might be that you need to minimize fluctuations on power going through your transmission line. But whatever the reasons, they certainly will not be trivial, and might be revelatory. Trivially dismissing the question adds no light.