Re: New nuclear plant at Sizewell set for green light

#211

Earlier quoted context omitted.

> One of the reasons that the electricity that Hinkley will one day produce is so expensive (£92.50 per megawatt hour, compared with gas and wind at about £40) is that the constructors were required to shoulder the risk of any cost overruns themselves. EDF estimates that the cost of electricity produced at Sizewell will be somewhere between £40 and £60. So even the company with a financial incentive to under-estimate…

> So even the company with a financial incentive to under-estimate the cost is saying that the electricity it produces will be at best as expensive as wind energy already is. ... And be low-carbon (~10gCO2/kWh). Whereas the £40/MWh estimate for wind included gas power generation, which is at 400gCO2/kWh. Given how wind has a typical load factor of 20-30% max in Western Europe, you’d be using gas at best 70% of the ti…

Using gas backup is a transition technology which is the most effective and available thing we have right now, and it won't stay that way. Demanding zero emissions right now is like to maliciously demand perfection in order to kill of something good.

Re: New nuclear plant at Sizewell set for green light

#212
post #164
post #105

Earlier quoted context omitted.

Western industry has progressively lost their ability to efficiently manage many types of heavy industry and large construction projects. This is particularly true for nuclear, which requires the application of disparate and highly specialized techniques and skillsets that are quickly lost. Though not to the same extent as the U.S., Japan, France, and South Korea have lost many of the same skills even though only a c…

Westinghouse was all rotten from the beginning, they sold reactors like cigarettes packs and disregarded scientists' safety concerns. Just look at the guy at 15:21. https://youtu.be/EviEN0ScOwg

So how do you turn a whole unsafe industry into a safe one? That's a lot of organizational DNA to change. Might as well convert a dinosaur into a gazelle.

Re: New nuclear plant at Sizewell set for green light

#213
post #111

Earlier quoted context omitted.

Well, EDF have not been so successful with their most recent project in France, Flamanville 3. Construction started in 2007, with estimated completion in 2012 at a cost of €3.3 billion. As of 2020, the plant is still not complete and the cost has spiralled to €19.1 billion. It is now tentatively planned to go online at the end of 2022.

We saw what happened to Areva building reactors on a fixed cost contract. Today's economic realities do not quite let one plan a 10 year project on a fixed cost. 3.3bn do not equate to 2007 3.3bn in 2020. The Chinese are able to do it because they not a free market economy, they can force people to work at gunpoint.

So, these things are not viable in a market economy? Why should they be pursued then?

Re: New nuclear plant at Sizewell set for green light

#214
post #114

Earlier quoted context omitted.

It's always astonishing how hydro and nuclear are so much better handled by SoEs like EDF or HydroQuebec that manage to turn a profit too, while private companies can never do it well.

This is basically about the cost of capital for the build and inability to insure for liability and future unforeseen costs.

But nuclear plants are not insured against major accidents. Nobody insures that, for some reason.

Re: New nuclear plant at Sizewell set for green light

#215
post #22

The others are already over budget and behind schedule, the private companies meant to be heading them are dropping like flies. This won't end well... https://www.bbc.co.uk/news/uk-wales-54158091 https://www.pbctoday.co.uk/news/energy-news/toshiba-withdraw... https://www.theguardian.com/uk-news/2019/sep/25/hinkley-poin...

> The others are already over budget and behind schedule The reason why is important though. Is it because of: 1) Political issues, where the government has set up incentives for the builder to lie? 2) Social issues, where environmentalists attack the project to drive up costs? It seems unbelievable to me that nuclear plant planners are unable to plan because ... dunno, maybe they hear nuclear and lose the ability to…

It must be the environmentalists! You must have heard that the US, the UK, and France has been run by environmentalists for the last 40 years!! /s

Re: New nuclear plant at Sizewell set for green light

#216
post #28

The others are already over budget and behind schedule, the private companies meant to be heading them are dropping like flies. This won't end well... https://www.bbc.co.uk/news/uk-wales-54158091 https://www.pbctoday.co.uk/news/energy-news/toshiba-withdraw... https://www.theguardian.com/uk-news/2019/sep/25/hinkley-poin...

At this point probably only the Chinese, Korean and Russian that can build Nuclear Power Plant properly.

So, nuclear plants are economical if and only if you happen to need some nuclear weapons? Isn't it?

Re: New nuclear plant at Sizewell set for green light

#217

Earlier quoted context omitted.

> So if you build enough nuclear power to fill in the gap in the duck curve, then you could just run those plants all day and ditch renewables. If you build enough nuclear power to fill the gap in the duck curve without storage, and remove fossil fuels, you're basically running entirely nuclear and hydro, and mostly nuclear. You end up building almost double the amount of capacity that you actually use, because you n…

The point is that nuclear is the only known geographically independent way of generating carbon free energy that isn't subject to intermittency. The redundancy isn't an issue with nuclear, it's an issue of the notion that we need nuclear and renewables. Just cut out the renewables, and only use nuclear. Using nuclear to fill in the duck curve makes renewables redundant, thus the aversion to nuclear of many proponents…

> The point is that nuclear is the only known geographically independent way of generating carbon free energy that isn't subject to intermittency.

For one, it needs a cool river with lots of water available for cooling. Which with climate change is, even in the UK, becoming less ubiquitous than it was so far.

Re: New nuclear plant at Sizewell set for green light

#218
post #112

Earlier quoted context omitted.

The point is that nuclear is the only known geographically independent way of generating carbon free energy that isn't subject to intermittency. The redundancy isn't an issue with nuclear, it's an issue of the notion that we need nuclear and renewables. Just cut out the renewables, and only use nuclear. Using nuclear to fill in the duck curve makes renewables redundant, thus the aversion to nuclear of many proponents…

I wonder which is easier? Large scale battery deployment or scaling nuclear. I think there are good reasons to be bullish about battery storage. It is already an area of massive research. It is something we need to scale anyway due to electric cars. And it is very easy to deploy to the existing grid. You just need a concrete pad, some power gear, and a substation. Being optimistic about nuclear does not mean we canno…

> I think there are good reasons to be bullish about battery storage.

I only need to look at how long my laptop lasts compared to 15 years ago.

Re: New nuclear plant at Sizewell set for green light

#219
post #93

Earlier quoted context omitted.

The point is that nuclear is the only known geographically independent way of generating carbon free energy that isn't subject to intermittency. The redundancy isn't an issue with nuclear, it's an issue of the notion that we need nuclear and renewables. Just cut out the renewables, and only use nuclear. Using nuclear to fill in the duck curve makes renewables redundant, thus the aversion to nuclear of many proponents…

Nuclear is not really geographically independent though. The plant has to be constructed to withstand earthquakes, floods, and other natural disasters.

> and other natural disasters.

Like Tsunamis.

Do you know where Flamanville is situated? Right next to the Atlantic ocean.

https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...

Re: New nuclear plant at Sizewell set for green light

#220
post #93

Earlier quoted context omitted.

Nuclear is not really geographically independent though. The plant has to be constructed to withstand earthquakes, floods, and other natural disasters.

It also has to be near a reliable water source so that it can be cooled. The bigger the power plant the more geographically constrained it is. France faces low river flow rates in the summer because of climate chance and this forces them to take some of the nuclear plants offline. Otherwise the waste heat would make it impossible for aquatic life to live near those power plants. Ever wondered why someone make an "obv…

Reliable cooling is also a big problem for the nuclear plants in the US East coast. They are away from the shore but well in reach of different types of disasters, like hurricanes, winter storms and flooding. They need reliable cooling and for that they depend on a working electrical grid. There are many ways in which the Fukushima disaster could repeat itself there - in a region which is rather densely populated.