First planned small nuclear reactor plant in the US has been canceled

arstechnica.com

151–160 of 332 posts

Re: First planned small nuclear reactor plant in the US has been canceled

#151

I think it's time to give up on nuclear. Solar+Wind+Batteries continue to get cheaper. Nuclear doesn't seem to have a detectible learning curve at all

No one has done more to harm the environment than environmentalists that advocate against nuclear power.

that may be historically true, but today you can build much more KW of solar+batteries than KW of nuclear for the same price. Continuing to advocate for nuclear is throwing away money that could be spent on the green transition.

Re: First planned small nuclear reactor plant in the US has been canceled

#152
Musk claims we can run the entire US off a 100 square mile solar arry + battery storage.

Does it make economic sense to just start working on this as a country, or is this still too cost prohibitive?

Seems like a system that you could upgrade over time as the tech gets better.

What are the downsides of such a concept?

Re: First planned small nuclear reactor plant in the US has been canceled

#153
post #131

It looks like the biggest problem with nuclear is not the safety or whatnot, it's just that as a civilization, we just can't build them without cost overruns and massive delays. And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal. Perhaps the other way to solve the energy transition is to lean heavily into mass storage of variable energy sources. If you have enough energy stora…

Would it be wrong to assume that we're dealing with an Apollo-style issue here (we "no longer have the technology to do it efficiently")? I'm certainly not an expert on nuclear power, but it is a little odd how the average nuclear reactor in the US is 42 years old [1].

[1]: https://www.eia.gov/energyexplained/nuclear/us-nuclear-indus...

Re: First planned small nuclear reactor plant in the US has been canceled

#154
post #131

It looks like the biggest problem with nuclear is not the safety or whatnot, it's just that as a civilization, we just can't build them without cost overruns and massive delays. And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal. Perhaps the other way to solve the energy transition is to lean heavily into mass storage of variable energy sources. If you have enough energy stora…

These are to be mass produced, and shipped to the site. So really, the first few will have cost overruns and delays, but then they should be able to re-use all the tooling, processes, transportation equipment, etc, to get the rest going.

Re: First planned small nuclear reactor plant in the US has been canceled

#155
post #103

> The decision to cancel the project followed an update from NuScale this year regarding the cost of building the reactors, which had soared to $9.3 billion from $5.3 billion because of rising interest rates and inflation. Even $5.3B seems very expensive. For reference, (the new Finnish) Olkiluoto-3 was €11 billion, for 1600 MW. The article says 6 * 77 MW = 539 MW! How is it that we've become so bad at building?

For additional data, a just announced start in Poland [1] is planned for $40B for 6 AP1000 reactors (6000 GW? maybe more), which sclaed down by 10x would make $4B for 600+ MW.

[1] https://www.independent.co.uk/news/poland-ap-polish-mateusz-...

Re: First planned small nuclear reactor plant in the US has been canceled

#156
post #131

It looks like the biggest problem with nuclear is not the safety or whatnot, it's just that as a civilization, we just can't build them without cost overruns and massive delays. And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal. Perhaps the other way to solve the energy transition is to lean heavily into mass storage of variable energy sources. If you have enough energy stora…

Just a point of clarity, we need demand resources, which means variable at our command vs not variable or variable based on wind/solar input out of our control. The economically viable mass storage options (i.e pumped storage) are basically all deployed. Batteries are getting there but they still need some shenanigans in the ancillary market where they get paid for not running for complex reasons to make the economic…

Batteries are already viable paired with solar. You see solar power purchase agreements in the 1.5 to 2c / kWh range and you can directly use that energy around 1/2 the time. Recharging and discharging batteries isn’t 100% efficient but it’s close.

Current numbers are lower, but in 2022 you could use LFP for ~5,000 discharge cycles and pay ~480$/kWh of capacity or ~9.6 c/kWh. Inverters etc last longer than the batteries themselves so you can amortize those costs across multiple generations of batteries, therefore it’s not quite upfront costs / number of discharge cycles, but it’s also not that far off of it. https://www.nrel.gov/docs/fy23osti/85332.pdf

Still roughly 2c/kWh * 105% + 9.6 c/kWh * 50% ~= 6.9c/kWh averaged over a day.

Currently batteries are discharged at peak demand, but the underlying economics scales just fine even if you double the number of solar panels for redundancy and aren’t being paid a premium. Further at scale demand that shifted to cheaper nighttime rates will instead shift to cheaper daytime rates.

Re: First planned small nuclear reactor plant in the US has been canceled

#157
post #131

It looks like the biggest problem with nuclear is not the safety or whatnot, it's just that as a civilization, we just can't build them without cost overruns and massive delays. And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal. Perhaps the other way to solve the energy transition is to lean heavily into mass storage of variable energy sources. If you have enough energy stora…

> And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal.

We need dispatchable energy to complement renewables. Nuclear is on the complete opposite side of the dispatchability equation with high CAPEX and low OPEX.

Like the cancellation exemplifies, even running at 100% nuclear is wholly uncompetitive. Being dispatchable means vastly lowering the utilization rate.

Re: First planned small nuclear reactor plant in the US has been canceled

#158
post #25

Earlier quoted context omitted.

> I am still very confused how power will be generated cleanly on cloudy, no-wind days with solar and wind. You are making it harder by adding that "cleanly" requirement, because the simple answer is going to be "natural gas". Unlike coal or nuclear, natural gas power plants are fast to start and stop (hydroelectric is even faster, but depends on favorable geography), so they can be left powered down (using no fuel)…

The problem with this 90% solution is that the more renewables are added, the more natural gas capacity is required to cover the capacity. Good problem for the natural gas industry. Going clean with nuclear isn’t cheap right now, and it shouldn’t be. It wasn’t at the start of renewables when solar was expensive. Cheap, reliable, clean; pick two.

There already is a massive amount of natural gas generating capacity. But if this capacity is used one tenth as much as it is currently used it will only use one tenth as much natural gas and will last much longer.

Re: First planned small nuclear reactor plant in the US has been canceled

#159

I think it's time to give up on nuclear. Solar+Wind+Batteries continue to get cheaper. Nuclear doesn't seem to have a detectible learning curve at all

The learning curve has been negative all throughout nuclear powers 70 year lifespan.

Re: First planned small nuclear reactor plant in the US has been canceled

#160
post #131

It looks like the biggest problem with nuclear is not the safety or whatnot, it's just that as a civilization, we just can't build them without cost overruns and massive delays. And this is a loss, because we need non-variable energy sources to augment wind/solar/tidal. Perhaps the other way to solve the energy transition is to lean heavily into mass storage of variable energy sources. If you have enough energy stora…

Wonder if it's worth digging into why that's the case. It seems like it's a lot more than just the cost of materials + labour that's the problem.

There's been some work done on this in the US context (eg [0]) but not really enough. It seems like general large project issues (need to adapt to site specific conditions as they are discovered, difficulty ensuring work stays properly scheduled so that construction workers don't sit idle for large amounts of time, etc.) are a big part, and these are made worse because of the knock on impact when these interact with safety regulations/processes.

There's some hope that making designs smaller and more modular might enable less chance of big overspend at a slightly higher expected cost but that's speculation until we actually do it.

0. https://www.sciencedirect.com/science/article/pii/S254243512...