I do have a question about JWST that I wasn't able to find a fine answer in other forums. A lot of people and engineers are saying that the JWST is a marvel of engineering, with truly inovative technical solutions and a giant step up compared to Hubble Telescope. And it does seems like so! However, I'm always baffled how everyone seems proud that the telescope has something like 200 SPOF during deployment, and if eve…
I suggest the book "Failure is not an option" by Gene Kranz, an Apollo flight director (played by Ed Harris in Apollo 13). He describes how the primary work of flight controllers in all missions is risk management. You are constantly balancing mission needs, fuel needs, mass needs, temperature needs, and etc etc. I don't think that a raw metric of the number of SPOF is the right way to measure the risk of this spacec…
Let's say a Falcon 9 launch is $90M. Falcon heavy let's say $200M.
So you take your 3x $3B. Put $200M/instrument into launch, have $2.8B per telescope leftover.
There just seems to be something wrong that it costs THIS much to build a telescope.
That said, the Thirty Meter Telescope is also a sort of "forever" job, the delays have stretched on and on.
I wonder if you did something like bid out and paid just on performance instead of this forever cost reimbursement thing. Right now if you can get onto one of these mega projects, and can stretch it out with delays, it basically can cover your career (ie, 20 year projects).