US tech firms pledge at White House to bear costs of energy for datacenters
141–150 of 265 posts
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#142which means nothing because no one believes there are legal consequences if they don't and there are a lot of ways to doge it even if there where a reliable government in place like especially if they do what they have been doing recently (run their own generator, build their own power planes) a lot of this cost is implicit and as such very dogeable. E.g. higher cost for gas power planes for other due to major increa…
Blinded by greed, I have never done it before, but I have seen the light, the bright future that we are all building toward.
From this day forth, I shall be righteous.
In your name, all good things come.
Hallelujah.
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#143> The agreement is meant to help mitigate concerns that big tech’s datacenters are driving up US electricity costs for homes and small businesses Exactly opposite will happen. Reason is, when Big Tech is paying huge amounts of money to contractors to build those power generation facilities and service companies to service it, they will abandon servicing other facilities (remember how Micron dropped consumer RAMs last…
So what’s the solution? No data center? Let the current landscape of power companies operate as is?
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#144Re: US tech firms pledge at White House to bear costs of energy for datacenters
#145We're all gonna end up paying for this and everyone involved knows it.
Soon I’ll get a used EV and cover the garage in panels too so I don’t have to care about wars causing surges in gas prices either.
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#146Re: US tech firms pledge at White House to bear costs of energy for datacenters
#147- They already invest in new power plants and connection infrastructure when they bring in new datacenters - Electricity for datacenters is based on capacity rather than actual usage - They already have backup generators at most datacenters that they can run during outages. It wouldn't be much work to allow those to feed power back into the grid in extraordinary circumstances - They generally use local contractors to build them for practicality purposes anyway.
This is just some fancy PR and nothing else.
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#148Re: US tech firms pledge at White House to bear costs of energy for datacenters
#149Alaska and Norway understood something critical when oil was discovered: if you don't assert collective ownership of the resource before private companies capture all the value, you never will. Alaska amended its constitution. Norway built the largest sovereign wealth fund on earth. Both were acts of people saying "this belongs to us, and we deserve a return on its extraction."
We are in exactly that window right now with AI. The resource is being extracted at an incredible pace and almost all the value is flowing to a handful of companies. The longer people wait to assert sovereign ownership over the collective intelligence that makes AI possible, the harder it becomes.
If you think this is crazy, ask yourself what’s actually crazier: demanding a share of the value built on your collective labor, or watching trillions of dollars get extracted from it and saying nothing.
the idea of Alaskans getting a check just for existing sounded crazy too, right up until it didn’t.
Re: US tech firms pledge at White House to bear costs of energy for datacenters
#150[1] Narrator: they will [2] Narrator: they won't