I really don't understand all the hyperbole around this bridge. It's a suspension bridge, so the relevant bits are at the pylons, which just happen to be on either side of a huge canyon. It clocks in at #14 on Wikipedia's list of longest suspension bridges, with a main span that is 603 meters shorter (2023 meters vs 1420) than the longest. More interestingly, to me at least, is the fact that 31 of the longest 50 are…
> The 2,890-metre-long structure, which took more than three years to complete, reduces travel time between the two sides of the canyon from two hours to two minutes.
Pretty impressive. I feel like things in the US take a lot longer and cost a lot more. The prime example is the second avenue subway extension which has been planned since 1920. But I just searched for a few significant bridges like the Gordie Howe bridge which took about 7 years and 6.4bn Canadian (connects US and Canada). And this bridge which seems a lot more of an engineering feat took 3 years and 8 months and cost between $280 to $292 million
https://en.wikipedia.org/wiki/Second_Avenue_Subway
https://en.wikipedia.org/wiki/Gordie_Howe_International_Brid...
https://www.barstoolsports.com/blog/3553875/the-new-tallest-...