Earlier quoted context omitted.
>> And charging stations are, of course, absolutely dirt cheap to build relative to fuel stations. Really? A normal gas station can handle around 100 cars per hour using a handful of pumps and is refueled by daily deliveries from a big truck. Simple. An electric charge point capable of that will require a massive amount of electricity, electricity delivered over wires. Look into how much it costs to run such a servic…
I'd want to see numbers for that argument, because I don't think I'm willing to buy it on assertion. A single, routine, boring 100A building drop is enough to charge 4-5 cars (i.e. "one station worth"), and those wires and infrastructure are already there, and have been for decades.
So a battery buffer needs to be built into the charging station in order to operate them cheaply, with a smoother load profile that the power company and grid operator will service without exorbitant costs.
Thankfully, at least one EV company has already realized this :-) Let's see if more than one of them eventually starts producing enough batteries to support the strategy.