My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.

That's the land allocation rather than the building-size / data-centre size.

The average data centre is 10,000 square metres (2.5 acres).

As well as compute and network facilities, DCs also need to accommodate parking, personnel areas, cooling, fire-suppression, power substations, power redundancy (generators), ground-security…

244 acres is absolutely at the upper end of any DC site.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#12
post #5

My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.

[dead]

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#13
post #4

What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.

Zoning laws. Many parts of the US but not all have land use zoning. The zoning for any property you buy is public record, so any business knows well in advance of what they are buying. If you want to deviate from the zoning you have to submit an application for that zoning variance which requires usually a community hearing.

Neither small or large businesses really have any big advantages here. Got to win over the community. If anything, the small business may be local and the operators more readily able to convince the community for a variance than some corporate lawyer.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#14
post #6

Wealthy white exclave succeeds in using environmental justice language to keep cheap coal-fired power to themselves. Very American outcome. Although I obviously don't care about Microsoft's outcome here, this was clearly a great site at the intersection of two transmission lines and with essentially infinite water resources. The data center would have been built in this scene. https://www.google.com/maps/@42.8440852,…

Some of us would like to keep our “infinite” water resources which actually aren’t infinite. I live beneath two transmission lines (overlapping, I guess, but not intersecting) and would prefer no data centre built here. Why? Because it will provide me no benefit whatsoever, reduce my property value, and worsen my quality of life due to things like light pollution and noise. If data centre operators would fix these th…

I support in principle the rights of towns to set their own land use rules, but on the larger societal picture I don't support people benefiting from things like intermodal shipping, goods distribution, and information services that they refuse to host. So I perceive a certain hypocrisy in this story.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#15
post #5

My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.

us-east-1 is a region. That means that it is 3 to 6 “availability zones” within a 100 km or so. Each of these availability zones consists of a cluster of data centers. Each cluster is perhaps 3-5 that are a few km from each other. The data centers will have tens of thousands of servers each.

So that is the mental model you should have for “how big is us-east-1”. But also, the data centers are not going to be, individually, anything like 244 acres. Best guess is that individual data centers are between 200,000 and 400,000 square feet. That is 5 to 10 acres.

Do the math above and us-east-1 may be 300 acres of floor space spread over a very large area.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#16
post #4

What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.

Depending on things, you might enter a land purchase (or lease) contract that's contingent on issuance of a building permit.

But a seller would probably prefer to sell without contingency, so what terms are available depends on market conditions.

Title insurance for residential real estate may sometimes cover properties that are unbuildable due to unsatisfiable permit requirements.

All told, it's easier as a buyer if you purchase an existing structure that was built under permits and is currently in use under appropriate occupancy permits.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#17
post #4

What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.

Zoning laws. Many parts of the US but not all have land use zoning. The zoning for any property you buy is public record, so any business knows well in advance of what they are buying. If you want to deviate from the zoning you have to submit an application for that zoning variance which requires usually a community hearing. Neither small or large businesses really have any big advantages here. Got to win over the co…

Also for a large enough utility hookup you will need to coordinate with the utility and or government since you can’t just plop down a large consumer on any old power line or pipe.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#18
post #14

Earlier quoted context omitted.

Some of us would like to keep our “infinite” water resources which actually aren’t infinite. I live beneath two transmission lines (overlapping, I guess, but not intersecting) and would prefer no data centre built here. Why? Because it will provide me no benefit whatsoever, reduce my property value, and worsen my quality of life due to things like light pollution and noise. If data centre operators would fix these th…

I support in principle the rights of towns to set their own land use rules, but on the larger societal picture I don't support people benefiting from things like intermodal shipping, goods distribution, and information services that they refuse to host. So I perceive a certain hypocrisy in this story.

Surely I benefit from a host of things for which I want nowhere near me. Strip mining, petroleum refining, chemical processing, coal fired electricity, etc. Am I allowed any autonomy or must we all accept that if a rich group wants to plop down a leather tanning factory across the street, I should have no recourse?

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#19
post #5

My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.

Based on a majority of games regions, US-East-1 is scattered properties in a <100 square mile area near Dulles Airport in Virginia, associated with an Internet backbone junction and former AOL campus in small town called Ashburn.

Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)

#20
post #4

What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.

From what I can tell Microsoft hasn't purchased the land yet. It's apparently owned by WE energies as part of the power plant next door.
Post reply on HN