Isn’t is simpler to pump the energy into a market pool connecting Morocco to the Iberian peninsula and connecting Britain to mainland Europe through the tunnel with France? Creating a cable to power a place thousands of km away seems rather inefficient compared to connecting the power stations to a grid of cables which already exists.
I also think it would better to use existing grids, but it may be easier to run direct cable than get all the pieces upgraded.