This article seems to be missing some critical information - does this proposed system help with anything but the framing?
Because framing a house, even a two story house, only takes an experienced crew a couple of days. And in the neighborhoods springing up around here, they are using pre-fab framed walls (still using wooden studs (which are cheap and plentiful), but they arrive on site as whole walls).
Before framing, there's site prep, foundation pours (probably some early HVAC and plumbing as well), floor joists, and floor sheeting. After framing, there's sheeting (the outside), roofing, putting in windows/doors, waterproofing (can be avoided with some more expensive sheeting options), and siding (which includes caulking the edges of the siding, and around any wall penetration).
Then there's insulating the outer walls, framing the interior walls, plumbing, electrical, HVAC, electrical, carpeting/flooring, drywall, trim, paint, landscaping... and probably a dozen other things I don't know about.
Optimizing only the framing - something that's already been pretty well optimized - isn't going to change prices much. What's really needed is a way to be ship entire finished walls.
(Seriously, look up some videos about "Larry Haun" and watch him and his brother frame an entire floor in under a day, using mostly hand tools).