Photovoltaics are still running after a year under Swiss trains
1–10 of 14 posts
Re: Photovoltaics are still running after a year under Swiss trains
#2Re: Photovoltaics are still running after a year under Swiss trains
#3I was in the doubter team too, but if this really worked out, that's great news. Congrats to the project team! Will be interesting to see if this scales well.
Re: Photovoltaics are still running after a year under Swiss trains
#4Re: Photovoltaics are still running after a year under Swiss trains
#5If it's about using wasted land, why not put them beside the rails, which would make access easier? There is usually a generous margin beside the tracks.
This would also allow bigger panels to be used.
Re: Photovoltaics are still running after a year under Swiss trains
#6What are the advantages to putting them between the rails, where you need trains to stop running in order to access them? If it's about using wasted land, why not put them beside the rails, which would make access easier? There is usually a generous margin beside the tracks. This would also allow bigger panels to be used.
Re: Photovoltaics are still running after a year under Swiss trains
#7Re: Photovoltaics are still running after a year under Swiss trains
#8Could they at least get a well-lit picture of panels that aren't covered in dirt and rocks? This is a lying eyes situation now. Depressing.
Re: Photovoltaics are still running after a year under Swiss trains
#9A lot of people doubted this could work. After all, railway tracks are a dusty, hot environment with tons of vibrations that could cause microcracks. I was in the doubter team too, but if this really worked out, that's great news. Congrats to the project team! Will be interesting to see if this scales well.
Re: Photovoltaics are still running after a year under Swiss trains
#10What are the advantages to putting them between the rails, where you need trains to stop running in order to access them? If it's about using wasted land, why not put them beside the rails, which would make access easier? There is usually a generous margin beside the tracks. This would also allow bigger panels to be used.