Atherton spent $145K to delay train electrification. The rest of us paid $400M
peninsulaforeveryone.org
Atherton spent $145K to delay train electrification. The rest of us paid $400M
1–10 of 100 posts
Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#2Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#3CEQA is basically a weapon for the rich to stop anything. It needs massive reform.
Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#4Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#5CEQA is basically a weapon for the rich to stop anything. It needs massive reform.
A big reform passed in 2025: https://calmatters.org/housing/2025/06/ceqa-urban-developmen...
> expand that exemption from CEQA to include a public project for the institution or increase of other passenger rail service, which will be exclusively used by zero-emission trains, located entirely within existing rail rights-of-way or existing highway rights-of-way.
Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#6Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#7I think we should have a letter writing campaign to shame residents of Atherton. There's not that many of them.
Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#8Re: Atherton spent $145K to delay train electrification. The rest of us paid $400M
#9CEQA is basically a weapon for the rich to stop anything. It needs massive reform.
A big reform passed in 2025: https://calmatters.org/housing/2025/06/ceqa-urban-developmen...