Live data from Hacker News

Viewing profile — monaelkass

monaelkass

HN member
Joined
Sun, Sep 20, 2020, 2:27 PM UTC
HN karma
13
Public activity
20 items

About monaelkass

No profile information was provided.

Recent public activity

  1. story
  2. story
  3. story
  4. story
  5. story
  6. story
  7. story
  8. comment
    Comment #24564693

    Thank you dear Aya :).

  9. comment
    Comment #24555605

    Yes this is the case of buildings sewage system where the population increases each year. But in case of camps, we don't have a big flow, and the pipes used are the smallest in siz…

  10. comment
  11. comment
    Comment #24554151

    Yes of course! It is found out that the circular design layout would be more economic than the hexagon design layout. Although, the circular design has less accommodation area than…

  12. comment
    Comment #24554116

    We have chosen the outfall to be in the middle of the circle and hexagonal sewage network. Yes of course, the topography should be first of all determined, this is what we did in t…

  13. comment
    Comment #24541704

    Intelligent comment, the layout 2 has the problem that you are talking about as the sewage is located in the center of the camp, but the layout 1 has a better design as it is half …

  14. comment
    Comment #24541646

    Good information... But Our project is based on a sewage network for a standard camp.

  15. comment
    Comment #24541574

    We used these camps standards to design the sewage system and of course to draw and design the standard camps.

  16. comment
    Comment #24536458

    In the camp, we can add a UDDT to reduce the amount of sewage and to help the recycling process. This will not have a big cost. other recycling methods could also be used.

  17. comment
    Comment #24535527

    I have done this project to help the UNHCR and any other association that is responsible for refugee camps.

  18. comment
    Comment #24535270

    Original author here: Yes of course, no one wants that the refugee camps be permanent, but as we can see, the camps are used at least for 5 to 10 years, and this is a long period s…

  19. comment
    Comment #24534686

    In this project, PVC pipes are used. These pipes are in danger of freezing when surrounding temperatures are nearly 20 degrees Fahrenheit. PVC pipes get brittle in cold weather and…

  20. comment
    Comment #24534363

    Original author here: yes of course, this project should be improved and many other additional services wil be added. I will also study a camp with UDDT to have a less amount of se…