Viewing profile — leomca
leomca
HN member- Joined
- Wed, Mar 02, 2022, 4:58 PM UTC
- HN karma
- 46
- Public activity
- 7 items
- HN profile
- View on Hacker News ↗
About leomca
No profile information was provided.
Recent public activity
-
comment
Comment #43821416
I think it's ENTSO-E, here's their most recent report into an incident on 21 June 2024: https://www.entsoe.eu/publications/system-operations-reports... For that incident, an expert…
-
comment
Comment #43821306
BBC reporting the head of Spain's electricity grid saying restoring power could take "between six and ten hours": https://www.bbc.co.uk/news/live/c9wpq8xrvd9t?post=asset%3A85...
-
comment
Comment #43821163
Interesting, but in terms of load I think think the data may just be delayed by ~1 hour. Switching to UTC, to avoid timezone confusion, it's currently 13:10: Last actual load value…
-
comment
Comment #43821026
It seems Spain lost 15GW of load, but is still running 10GW of load: https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/sh... Would this suggest the grid hasn't snapped apar…
-
comment
Comment #43820908
The best source for data seems to be the European grid operator themselves: https://transparency.entsoe.eu/dashboard/show Spain's demand: https://transparency.entsoe.eu/load-domain…
-
comment
Comment #43820872
Spain loses around 15GW of demand at the same time: https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/sh... I don't think we're able to tell from the data if one is the cau…
-
comment
Comment #43820774
Yes, France was importing 884MW from Spain at 12:45, 198MW at 13:00, no net flow at 13:15, and Spain has been importing up to 265MW since: https://transparency.entsoe.eu/transmissi…